|
Name
of work |
Due
date |
|
“ENQ-Removal,
fabrication, supply and erection of new side
gate, reconditioning of main gate, revamping of
gardening on either side of main gate and
reconditioning of pier entrance gate” |
19/03/2012 |
|
“NIT-Laying
of U.G. Cable and providing new power service
connection at the tunnel site, New Port, Port
Department” |
05/03/2012 |
|
“ENQ-Reconditioning
of cutter shaft of dredger ‘Karaikal’ ” |
16/02/2012 |
|
“ENQ-Reconditioning
of cutter head of dredger ‘Karaikal’ ” |
15/02/2012 |
|
“NIT-Renewal and reconditioning of sea water
pumps, pipelines and valves of dredger
‘Karaikal'” |
10/02/2012 |
|
“SBQ-Renewal and reconditioning of sea water
pumps, pipelines and valves of dredger
‘Karaikal'” |
13/01/2012 |
|
“NIT-Reconditioning of
the Hydraulic spud ram of dredger ‘Karaikal’ ” |
29/12/2011 |
|
“ENQ-Supply of
marine grade polyurethane and epoxy paints for dredger ‘Karaikal’ ” |
26/12/2011 |
|
“BQ-Renewal and
reconditioning of sea water pumps, pipelines and
valves of dredger ‘Karaikal’ ”
|
23/12/2011 |
|
“NIT-Renewal of Hydraulic
tubing and related valves in the Hydraulic
circuitry pertaining to cutter motor system /
auxillary system of the hydraulic system in dredger ‘Karaikal’ ” |
15.12.2011 |
|
“NIT-Renewal of Hydraulic
tubing and related valves in the Hydraulic
circuitry pertaining to side winches of the hydraulic system in dredger ‘Karaikal’ ” |
01/12/2011 |
|
“BQ-Reconditioning of
the Hydraulic spud ram of dredger ‘Karaikal’ ” |
28/11/2011 |
|
“NIT-Renewal of Hydraulic
tubing and related valves in the Hydraulic
circuitry pertaining to cutter ladder / spud ram of the hydraulic system in dredger ‘Karaikal’ ” |
28/11/2011 |
|
“NIT-Removal of old
discharge pipeline, fabrication, supply and
installation of new discharge pipeline in dredger ‘Karaikal’ ” |
24/11/2011 |
|
|
03/10/2011 |
|
“Renewal of Hydraulic
tubing and related valves in the Hydraulic
circuitry pertaining to side winches of the hydraulic system in dredger ‘Karaikal’ ” |
05/10/2011 |
|
“Removal of old
suction pipeline, fabrication, supply and
installation of new suction pipeline in dredger ‘Karaikal’ ”
Corrigendum |
10/10/2011
13/10/2011
|
|
“Renewal of Hydraulic
tubing and related valves in the Hydraulic
circuitry pertaining to cutter motor system /
auxillary system of the hydraulic system in dredger ‘Karaikal’ ” |
12/10/2011 |
|
“Removal of old
discharge pipeline, fabrication, supply and
installation of new discharge pipeline in dredger ‘Karaikal’ ” |
24/10/2011 |